Monday, November 5, 2007

Friday, November 2nd - Sunday November 4th/2007

-Stanley and I changed out the entire water supply in the house with Pecs pipe. It is super easy to install and did not leak. It took us 12 hours and cost around $300. Installed heater in bathroom.

-Tightened alternator belt on my car and repaired loose wires. Installed after-market dash lighting to replace the failing old lights; much easier than taking the dash apart.

-Annie and I finished sawing up the pile of wood that was drying on the haywagon. A good 3 or 4 cords.

-Returned the saw to Richard.

-Installed clothes dryer upstairs for Annie.

No comments: